-
Second Test
No sooner did we finish our first pre-production test on January 26 at the McAuliffe-Shepard Discovery Center did we plan our second one for March 4. This was going to be more than a handful of shots and walkthrough. Our second test would involve lighting, sound and set construction. I believe pre-production is the most…
-
Production Design
With our next testing date for First Signal coming up in a week, my attention has started to turn to production design. Last year I went through the script page by page to see what we needed for props along with thoughts on the overall look of the film from a production design point of…